Kanaga’s Chemi Dose






Features:

  • Gland less and leakage free teflon faced Diaphragm
  • Electromechanical solenoid driven by robust electronic pulser
  • Excellent dosage linearity
  • Adjustable injection frequency
  • Special G.F.P.P. Long life housing
  • Compact in all means
  • Low Power Consumption

Standard Accessories

  • L.D.P.E. Tubing
  • Spring loaded injection check valve & Foot valve

Optional Accessories

  • H.D.P.E. Chemical storage Tank
  • F.R.P. Chemical Storage Tanks with Low Level Float Switch

Installation & Operation

  • Fix the pump securely in a safe location away from sunlight, sources of heat and other dangerous environs, allowing for a maximum suction lift of 1 metre only
  • Cut the supplied tubing into 1 Metre length and connect one of its ends to the suction of the pump and other to the foot valve
  • Ensure the suction tubing is held straight within the chemical storage tank
  • Connect the rest of the required length of tubing to the discharge side of pump head
  • Connect the NRV in a vertical position in the required injection point
  • Position the discharge tube above the pump head in a safe direction
  • Plug in the Mains Chord of the pump to a single phase 230vAC, 5Amps Socket
  • Wait for the pump to prime into the head.
  • As soon as the liquid starts to flow out of the tube turn off the pump promptly now and connect the fully primed tube into the NRV
  • Turn the pump on again and check for leaks in all areas
  • Now finally adjust the speed buttons as per your dosing requirement

Specifications

MODEL MAX CAPACITY LPH MAX PRESSURE KG/CM2 END CONNECTION
CD/CDMP 5
10
4
1
LDPE Tubing 3/8" x 1/4"



Features:

  • Gland less and leakage free Teflon Faced Diaphragm
  • Electromechanical solenoid driven by robust electronic mictroprocessor pulser
  • Excellent dosage linearity
  • Fine adjustable facility of stroke speed & stroke length upto 1spm, max 99 spm
  • Special G.F.P.P. Long life housing
  • Provision for low level cut-off
  • Compact in all means
  • Low Power Consumption

Standared Accessories

  • L.D.P.E. Tubing
  • Spring loaded injection check valve & Foot valve

Optional Accessories

  • H.D.P.E. Chemical Storage Tank
  • F.R.P. Chemical Storage Tanks with Low Level Float Switch

Installation & Operation

  • Fix the pump securely in a safe location away from sunlight, sources of heat and other dangerous environs, allowing for a maximum suction lift of 1 metre only
  • Cut the supplied tubing into 1 Metre length and connect one of its ends to the suction of the pump and other to the foot valve
  • Ensure the suction tubing is held straight within the chemical storage tank
  • Connect the rest of the required length of tubing to the discharge side of pump head
  • Connect the NRV in a vertical position in the required injection point
  • Position the discharge tube above the pump head in a safe direction
  • Plug in the Mains Chord of the pump to a single phase 230vAC, 5Amps Socket
  • Wait for the pump to prime into the head.
  • As soon as the liquid starts to flow out of the tube turn off the pump promptly now and connect the fully primed tube into the NRV
  • Turn the pump on again and check for leaks in all areas
  • Now finally adjust the speed buttons as per your dosing requirement

Specifications

MODEL MAX CAPACITY LPH MAX PRESSURE KG/CM2 END CONNECTION
CD/CDMP 5
10
4
1
LDPE Tubing 3/8" x 1/4"